Wind power project at Gujarat by Powerica Limited

Registry Record

Registry

Verra

Project ID

VCS701

Country

India

Category

Renewable Energy

Methodology

ams-i-d

Status

Registered

Credits Issued

244,452 tCO₂e

Credits Retired

202,882 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2010 to 2022: 244,452 tonnes issued and 202,882 retired.012.5k25k37.5k50k2010 issued: 16,388 tonnes2010 retired: 16,388 tonnes20102013 issued: 23,415 tonnes2013 retired: 23,415 tonnes20132014 issued: 22,222 tonnes2014 retired: 22,222 tonnes20142015 issued: 24,722 tonnes2015 retired: 24,722 tonnes20152016 issued: 24,079 tonnes2016 retired: 24,079 tonnes20162017 issued: 25,163 tonnes2017 retired: 25,163 tonnes20172018 issued: 24,926 tonnes2018 retired: 24,926 tonnes20182019 issued: 23,052 tonnes2019 retired: 23,052 tonnes20192020 issued: 18,915 tonnes2020 retired: 18,915 tonnes20202021 issued: 21,273 tonnes20212022 issued: 20,297 tonnes2022
VintageIssued (tCO₂e)Retired (tCO₂e)
202220,297none
202121,273none
202018,91518,915
201923,05223,052
201824,92624,926
201725,16325,163
201624,07924,079
201524,72224,722
201422,22222,222
201323,41523,415
201016,38816,388

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • AMS-I.D. - Grid connected renewable electricity generation - 1.0-18.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2010, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2010, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

India and Article 6

Bilateral agreements
2
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

82.3% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
Delta Air Lines119,3662019
Boeing17,7642021
BSkyB16,3882013
Air France13,4152022

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Wind power project at Gujarat by Powerica Limited is registered with Verra under the ams-i-d protocol, located in India. As of 1 June 2026, registry records show 244,452 tonnes issued and 202,882 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Wind power project at Gujarat by Powerica Limited issued?

244,452 tonnes of credits have been issued and 202,882 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from Wind power project at Gujarat by Powerica Limited?

Registry records name 4 organisations, including Delta Air Lines, Boeing, BSkyB. Many retirements name no beneficiary.

Registry data as of June 1, 2026