Wind Power Project in Tamil Nadu by Green Infra Renewable Energy Limited

Registry Record

Registry

Verra

Project ID

VCS1904

Country

India

Category

Renewable Energy

Methodology

acm0002

Status

Not stated

Credits Issued

4,297,410 tCO₂e

Credits Retired

1,659,141 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2018 to 2025: 4,297,410 tonnes issued and 1,659,141 retired.0250k500k750k1M2018 issued: 86,802 tonnes2018 retired: 80,000 tonnes20182019 issued: 677,920 tonnes2019 retired: 471,726 tonnes20192020 issued: 697,972 tonnes2020 retired: 53,230 tonnes20202021 issued: 675,358 tonnes2021 retired: 364,143 tonnes20212022 issued: 633,136 tonnes2022 retired: 102,222 tonnes20222023 issued: 528,875 tonnes2023 retired: 73,015 tonnes20232024 issued: 675,012 tonnes2024 retired: 428,488 tonnes20242025 issued: 322,335 tonnes2025 retired: 86,317 tonnes2025
VintageIssued (tCO₂e)Retired (tCO₂e)
2025322,33586,317
2024675,012428,488
2023528,87573,015
2022633,136102,222
2021675,358364,143
2020697,97253,230
2019677,920471,726
201886,80280,000

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesCannot be confirmed from available dataCredits issued for vintages 2021 to 2025. The start of the first crediting period is not in registry data.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesCannot be confirmed from available dataCredits issued for vintages 2021 to 2025. The start of the first crediting period is not in registry data.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

India and Article 6

Bilateral agreements
2
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
0
Article 6.2 activities
0
Crediting Mechanism activities approved by the host
0
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

52.2% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
ZIPAIR384,5652025
TotalEnergies273,6832023
ENGIE80,0002024
Estra Energie58,6352025
Qantas57,4082024
Signature Floorcoverings6,2642024
Frasers Property4,0182024
The University of Melbourne2,0002023

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Wind Power Project in Tamil Nadu by Green Infra Renewable Energy Limited is registered with Verra under the acm0002 protocol, located in India. As of 1 June 2026, registry records show 4,297,410 tonnes issued and 1,659,141 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Wind Power Project in Tamil Nadu by Green Infra Renewable Energy Limited issued?

4,297,410 tonnes of credits have been issued and 1,659,141 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from Wind Power Project in Tamil Nadu by Green Infra Renewable Energy Limited?

Registry records name 8 organisations, including ZIPAIR, TotalEnergies, ENGIE. Many retirements name no beneficiary.

Registry data as of June 1, 2026