Österreichische Post carbon credit retirements

Built from registry retirement records that name this organisation as beneficiary. Retirements that name no beneficiary, or name it differently, are not included, so this view is partial.

Key figures

Tonnes retired

162,089

Retirements

66

Years

2011 to 2018

Projects

16

Registries

2

Source: Registry records · Data as of 1 June 2026

Retirements by year

Tonnes by the year the retirement was recorded.

Tonnes retired by yearÖsterreichische Post: 162,089 tonnes retired, 2011 to 2018, by year of retirement.012.5k25k37.5k50k2011: 25,264 tonnes20112012: 18,500 tonnes20122013: 32,000 tonnes20132014: 26,034 tonnes20142015: 27,466 tonnes20152016: 27,824 tonnes201620172018: 5,001 tonnes2018
YearTonnes retired
2018 5,001
2017 none recorded
2016 27,824
2015 27,466
2014 26,034
2013 32,000
2012 18,500
2011 25,264

Source: Registry records · Data as of 1 June 2026

By project type

TypeTonnesShare
Renewable Energy119,07573.5%
Forest20,76412.8%
Fuel Switching16,0009.9%
Not specified4,0002.5%
Ghg Management2,2501.4%

Types as the registries record them.

By registry

RegistryTonnesShare
Verra154,08995.1%
Gold Standard8,0004.9%

By vintage

The year the emission reduction or removal took place.

VintageTonnesShare
Before 2016162,089100%
2016 to 202000%
2021 onwards00%

By host country

CountryTonnesShare
India33,91720.9%
Indonesia30,00018.5%
China29,24118%
Colombia20,26412.5%
Thailand18,25011.3%
Vietnam11,0006.8%
Taiwan11,0006.8%
Türkiye4,6672.9%
Uganda2,2501.4%
Mali1,0000.6%

The 10 largest of 11 countries.

ICVCM status of methodologies

Current statusTonnesShare
Methodology assessed and not approved119,07573.5%
No ICVCM decision on the methodology yet39,01424.1%
Methodology not matched to ICVCM records4,0002.5%

Status shown is the methodology's current ICVCM status. It may have been decided after these credits were retired.

What the ICVCM status means

Removals and avoidance

ClassTonnesShare
Impermanent removal20,26412.5%
Reduction or avoidance141,82587.5%

Removals: 20,264 tonnes (long-duration and impermanent). Reduction or avoidance: 141,825 tonnes.

How projects are classed

Projects retired from

Largest first. 16 projects.

ProjectRegistryCountry TonnesYears
210 MW Musi Hydro Power Plant, Bengkulu VCS487 · Renewable Energy Verra Indonesia 30,000 2011 to 2015
18.86 MW Bundled Wind Power Project, India VCS497 · Renewable Energy Verra India 30,000 2011 to 2016
Grouped Hydropower Plants in Chongqing, Yunnan,Sichuan and Guizhou Provinces, P.R. China VCS438 · Renewable Energy Verra China 29,241 2013 to 2018
Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia VCS576 · Forest Verra Colombia 20,264 2011 to 2015
Siam Cement Biomass Project VCS403 · Fuel Switching Verra Thailand 16,000 2012 to 2016
Ban Coc Hydropower Project VCS843 · Renewable Energy Verra Vietnam 11,000 2012 to 2016
Hsikou Hydro Power Project VCS342 · Renewable Energy Verra Taiwan 7,000 2012 to 2016
InfraVest Changbin and Taichung bundled Wind Farms Project - Taiwan (300190) GLD472 · Renewable Energy Gold Standard Taiwan 4,000 2012 to 2016
Aliaga Wind Farm GLD735 Gold Standard Türkiye 3,000 2012 to 2015
Bugoye 13.0 MW Run-of-River Hydropower Project VCS1199 · Renewable Energy Verra Uganda 2,250 2013 to 2015
Solar PV power project by Roha Dyechem Pvt. Ltd. (EKIESL.CDM.Aug-11-02) VCS1090 · Renewable Energy Verra India 2,250 2013 to 2016
Wastewater Treatment with Biogas Production (UASB) and Heat Utilization at General Starch Co Ltd. VCS82 · Ghg Management Verra Thailand 2,250 2013 to 2015
Golova and Sevindik HPPs of Subehri Hydropower Project VCS914 · Renewable Energy Verra Türkiye 1,667 2018
Grouped Wind Power Project in India VCS429 · Renewable Energy Verra India 1,667 2018
*Improved Household Charcoal Stoves in Mali GLD414 Gold Standard Mali 1,000 2014 to 2016
KARIBA REDD+ PROJECT VCS902 · Forest Verra Zimbabwe 500 2013

Source: Registry records · Data as of 1 June 2026

Questions about Österreichische Post

How many carbon credits has Österreichische Post retired?

Registry records name Österreichische Post as beneficiary for 162,089 tonnes across 66 retirements since 2011, as of 1 June 2026.

Which projects has Österreichische Post retired credits from?

210 MW Musi Hydro Power Plant, Bengkulu (30,000 tonnes); 18.86 MW Bundled Wind Power Project, India (30,000 tonnes); Grouped Hydropower Plants in Chongqing, Yunnan,Sichuan and Guizhou Provinces, P.R. China (29,241 tonnes). The full list of 16 projects is on this page.

Is this a complete record?

No. It includes only retirements whose registry record names this organisation. Retirements that name no beneficiary, or name it differently, are not included.

Represent this organisation and see an error? Request a correction.