EU ETS installations in Ireland
In 2025, 117 installations reported 10,670,686 tonnes of verified emissions and received 3,619,072 free allowances. 142 installations are on record since 2013.
Reporting in 2025
117
Verified emissions
10,670,686 t
Free allocation
3,619,072
Allocation as share of emissions
33.9%
Source: European Commission, Union Registry · Data as of 1 April 2026
By activity, 2025
- Combustion of fuels 8,022,821 t · 106
- Production of cement clinker 2,199,312 t · 4
- Refining of mineral oil 291,879 t · 1
- Production of lime, or calcination of dolomite/magnesite 118,905 t · 3
- Production or processing of gypsum or plasterboard 34,045 t · 1
- Manufacture of ceramics 3,638 t · 1
- Capture of greenhouse gases under Directive 2009/31/EC 86 t · 1
Installations
Largest 2025 verified emissions first; installations that did not report in 2025 follow.
- Waterford Proteins/ABP Waterford 13,334 t in 2025
- ESB - Ringsend FlexGen 12,546 t in 2025
- C&D Foods 11,628 t in 2025
- BASF Ireland Designated Activity Company 11,522 t in 2025
- Killeshandra Site 11,350 t in 2025
- Pelagia Killybegs 11,349 t in 2025
- MSD Ireland (Carlow) 10,288 t in 2025
- Pfizer Ireland Pharmaceuticals 10,020 t in 2025
- Abbvie 9,655 t in 2025
- Tawnaghmore Generating Station 9,555 t in 2025
- ESB Shannonbridge Temporary Emergency Generation 8,651 t in 2025
- Janssen Sciences Ireland UC 8,527 t in 2025
- Tarbert Generating Station 8,512 t in 2025
- MEDITE Europe DAC 8,112 t in 2025
- Bristol Myers Squibb Cruiserath Biologics 7,508 t in 2025
- Guerbet Ireland Unlimited Company 7,232 t in 2025
- Minch Malt Limited 7,070 t in 2025
- Dublin Airport 6,410 t in 2025
- WuXi Biologics 5,722 t in 2025
- South Dublin Routing 4 No. 2 Limited 5,567 t in 2025
- University Hospital Galway 5,114 t in 2025
- Alexion College Park 4,847 t in 2025
- Genzyme Ireland Limited 4,541 t in 2025
- MSD International GmbH t/a MSD Ireland (Brinny) 3,983 t in 2025
- MSD Ireland (Biotech Dublin) 3,822 t in 2025