82 MW Lau Renun Hydro Power Plant, North Sumatra

Registry Record

Registry

Verra

Project ID

VCS488

Country

Indonesia

Category

Renewable Energy

Methodology

acm0002

Status

Registered

Credits Issued

2,609,231 tCO₂e

Credits Retired

2,146,823 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2009 to 2020: 2,609,231 tonnes issued and 2,146,823 retired.0125k250k375k500k2009 issued: 148,966 tonnes2009 retired: 148,966 tonnes20092010 issued: 201,620 tonnes2010 retired: 201,620 tonnes20102011 issued: 218,483 tonnes2011 retired: 218,483 tonnes20112012 issued: 276,736 tonnes2012 retired: 227,203 tonnes20122013 issued: 257,736 tonnes2013 retired: 241,388 tonnes20132014 issued: 214,524 tonnes2014 retired: 214,524 tonnes20142015 issued: 234,802 tonnes2015 retired: 188,936 tonnes20152016 issued: 186,385 tonnes2016 retired: 76,533 tonnes20162017 issued: 236,965 tonnes2017 retired: 136,885 tonnes20172018 issued: 218,237 tonnes2018 retired: 110,504 tonnes20182019 issued: 228,769 tonnes2019 retired: 195,773 tonnes20192020 issued: 186,008 tonnes2020 retired: 186,008 tonnes2020
VintageIssued (tCO₂e)Retired (tCO₂e)
2020186,008186,008
2019228,769195,773
2018218,237110,504
2017236,965136,885
2016186,38576,533
2015234,802188,936
2014214,524214,524
2013257,736241,388
2012276,736227,203
2011218,483218,483
2010201,620201,620
2009148,966148,966

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2009, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2009, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

Indonesia and Article 6

Bilateral agreements
4
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
1
Article 6.2 activities
40
Crediting Mechanism activities approved by the host
14
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

3.4% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
EYGS42,2402020
Interface30,0002016

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

82 MW Lau Renun Hydro Power Plant, North Sumatra is registered with Verra under the acm0002 protocol, located in Indonesia. As of 1 June 2026, registry records show 2,609,231 tonnes issued and 2,146,823 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has 82 MW Lau Renun Hydro Power Plant, North Sumatra issued?

2,609,231 tonnes of credits have been issued and 2,146,823 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from 82 MW Lau Renun Hydro Power Plant, North Sumatra?

Registry records name 2 organisations, including EYGS, Interface. Many retirements name no beneficiary.

Registry data as of June 1, 2026