Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia

Registry Record

Registry

Verra

Project ID

VCS144

Country

Indonesia

Category

Renewable Energy

Methodology

acm0002

Status

Not stated

Credits Issued

1,611,746 tCO₂e

Credits Retired

1,595,293 tCO₂e

Data as of

1 June 2026

Issuance and retirement by vintage

Issued Retired
Issuance and retirement by vintageVintages 2009 to 2019: 1,611,746 tonnes issued and 1,595,293 retired.0125k250k375k500k2009 issued: 400,261 tonnes2009 retired: 399,938 tonnes20092010 issued: 98,510 tonnes2010 retired: 98,510 tonnes20102011 issued: 137,084 tonnes2011 retired: 136,917 tonnes20112012 issued: 132,695 tonnes2012 retired: 132,687 tonnes20122013 issued: 87,300 tonnes2013 retired: 85,869 tonnes20132014 issued: 124,544 tonnes2014 retired: 124,222 tonnes20142015 issued: 150,586 tonnes2015 retired: 150,586 tonnes20152016 issued: 122,665 tonnes2016 retired: 121,398 tonnes20162017 issued: 123,740 tonnes2017 retired: 110,805 tonnes20172018 issued: 129,921 tonnes2018 retired: 129,921 tonnes20182019 issued: 104,440 tonnes2019 retired: 104,440 tonnes2019
VintageIssued (tCO₂e)Retired (tCO₂e)
2019104,440104,440
2018129,921129,921
2017123,740110,805
2016122,665121,398
2015150,586150,586
2014124,544124,222
201387,30085,869
2012132,695132,687
2011137,084136,917
201098,51098,510
2009400,261399,938

Source: Registry records · Data as of 1 June 2026

Credit Passport in detail

ICVCM quality status

Methodology assessed by ICVCM and not approved.

  • Programme: Verified Carbon Standard, CCP-eligible since May 2024.
  • ACM0002 - Grid-connected electricity generation from renewable sources - 1.0-21.0: does not meet the Core Carbon Principles

The CCP label is applied to credits by the registry, issuance by issuance. An approved methodology means credits from this project can be eligible; it does not mean every credit carries the label.

Source: ICVCM assessment decisions · Decisions read 19 September 2026

What this layer checks

CORSIA screen

A screen against published ICAO criteria, not an eligibility determination.

First phase, 2024 to 2026

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2024 to 2026.
  • DatesDoes not passCredits were issued for vintage 2009, so crediting began before 1 January 2016.
  • Host country authorisationCannot be confirmed from available dataAuthorisation is granted per activity. This screen cannot confirm whether this project holds a Letter of Authorization.

Second phase, 2027 to 2029

  • ProgrammePassesVerified Carbon Standard is approved by ICAO for 2027 to 2029.
  • DatesDoes not passCredits were issued for vintage 2009, so crediting began before 1 January 2016.

Programme-specific exclusions were not assessed. Host country context is under Article 6 below.

Source: ICAO eligibility decisions and registry records · Criteria verified 25 September 2026

What this layer checks

Indonesia and Article 6

Bilateral agreements
4
Authority for the Paris Agreement Crediting Mechanism
Appointed
Participation requirements for the Mechanism
Published
Cooperative approaches
1
Article 6.2 activities
40
Crediting Mechanism activities approved by the host
14
Crediting Mechanism activities registered
0

This is country-level context. It does not show whether this project is authorised.

Source: UN Article 6 tracking · Data as of 4 September 2026

What this layer checks

Recorded buyers

Organisations named in registry retirement records. Many retirements name no beneficiary, so this list is partial.

26.5% of retired tonnes name an organisation as beneficiary.

OrganisationTonnes retiredLatest year
Credit Suisse151,9002016
Audi125,0002021
Volkswagen86,0002021
ERGO31,5002014
SEAT11,2002022
GroenBalans6,5002011
Alcantara5,0002011
British Airways3,4762024
BNP Paribas1,7592022
Lupe Technology452023

Retired credits from this project? See what a company can still say about them under the EU green claims rules.

Source: Registry records · Data as of 1 June 2026

What this layer checks

Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia is registered with Verra under the acm0002 protocol, located in Indonesia. As of 1 June 2026, registry records show 1,611,746 tonnes issued and 1,595,293 tonnes retired. This reflects registry-reported figures, not an independent quality assessment.

Related

Similar projects

Same methodology and country, largest issuance first.

Questions about this project

How many credits has Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia issued?

1,611,746 tonnes of credits have been issued and 1,595,293 retired, according to registry records as of 1 June 2026.

What is the ICVCM status of this project's methodology?

Methodology assessed by ICVCM and not approved. The CCP label is applied to credits by the registry, issuance by issuance.

Which organisations have retired credits from Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia?

Registry records name 10 organisations, including Credit Suisse, Audi, Volkswagen. Many retirements name no beneficiary.

Registry data as of June 1, 2026